Belize Part 167 (May 28 to June 3)

Belize Part 167 (May 28 to June 3)

May 28 Life in the jungle: First thing, I slaughtered the last broiler (meat) chicken.  The last few days, I have been moving dirt dug up from the excavator work the other week.  I have a lot of places to fill in.  Currently, the dirt moisture level is acceptable for...
Belize Part 165 (May 7 to 19)

Belize Part 165 (May 7 to 19)

May 7 Life in the jungle: First thing, I headed down the road and finished yesterday’s chopping off.  A heavy equipment company is coming in a week, and I want to make sure the road is 100% ready for their trucks. Then I mixed half a bag of cement and poured the...
Belize Part 164 (April 30 to May 6)

Belize Part 164 (April 30 to May 6)

A Malachite butterfly April 30 Life in the jungle: First thing, I mixed half a bag of cement to make more patio stones, and then moved on to painting the new cabana.  After lunch, I went back to painting the cabana. In the afternoon, Andy and I headed to Isabella Bank...

Pin It on Pinterest