October 2
Life in the jungle: First thing, I did some greenhouse work and worked on PVC water lines for the water cistern.  Later in the afternoon, Saul came by and cast the floor for the cistern water pump house.

Right after he left, my river pump died.  When I went to troubleshoot, I touched the motor, and it was super hot.  This is not good.

Without water, I bathed out of a rain barrel this evening.  I’m still wondering when I can catch a break this year.

Future water cistern pump house

October 3
Life in the jungle: It rained throughout the night – heavily.  If I were one day ahead or the rain held off one day, my water cistern would have probably collected a fair amount of water.  Today I would have easily had the cistern set up to collect rainwater.  I just can’t catch a break.

I slept in a tiny bit just listening to the rain.  I also discovered Saucy escaped the yard last night.  She was punished with no breakfast.

First thing I did was complete the PVC lines from the cistern to the pump house.  I then quickly ran up to the village to drop off some eggs.  After breakfast, I spent the afternoon giving one last cleaning to the interior of the cistern.  I then modified the eavestroughs and gutters to send the roof water into the cistern.

I am now able to collect rainwater off the roof.

I quit my day about 45 minutes earlier than usual.  I’m just tired.

Gutters are now connected to the water cistern

October 4
Life in the jungle: There were some heavy rains throughout the night, resulting in a couple of inches of water in the cistern.  Honestly, I expected more water.

I wrote Belize blog Part 234 before feeding the chickens.  After feeding the chickens as per my Sunday morning routine, I spent an hour at the riverbank, followed by my mandatory Sunday morning nap that went longer than usual.

Sunday morning on the riverbank

After lunch, Saul showed up to help fix my pump.  We were pretty sure the pump was burned out.  It turned out to be the capacitor.  Saul switched the capacitor out from my backup pump, and now I have water again.  I don’t know what I would do without Saul.

It was overcast all day, but no rain.

October 5
Life in the jungle: I wrote Belize blog Part 235.  After feeding the chickens, I cleaned up the forms and work area for the new pump house.  I also cleaned and painted sections of the greenhouse framing.

After breakfast, I headed to the village to deliver eggs.  I almost rode over a Blacktail Cribo snake.  My bike has no brakes, and I had to slide both my feet off my pedals and lift my front wheel in less than a second to avoid going over its tail.  On the way home, I saw a coatimundi.

When I got home, I cut grass at the ponds, and I finished mound 2.  Right before dark, I hand-pollinated passion fruit. The blooms are back for a second crop this year.

October 6
Life in the jungle: I shared blog posts Raising Chickens and Ducks in the Belize Jungle: What Worked for Me (and What Didn’t) and What to pack on your first bike tour blog posts to Belize and bike touring Facebook groups, respectively.

I then did greenhouse work.

After breakfast, I worked on my memoir.  It’s been a little while since I last worked on it.  I’m determined to publish it in early November.  I finished the latest proofreading run-through.  Unfortunately, I’m convinced I need another proofreading.  At 90,000 words, each run-through takes a lot of time, not to mention that I think my next run-through will be at least my fifth time reading my own memoir.  Five times reading the same 90,000 words – ugh.

October 7
Life in the jungle: There was rain in the night.  This morning, I did some greenhouse work, planting a few watermelons.  I then ran up to the village to drop off some eggs.

After breakfast, I worked on my memoir, specifically working on the formatting aspect.

I then went back to greenhouse work, planting some vegetable seeds (cucumber, cantaloupe, and honeydew).  It was quite hot with zero breeze.  I continued to pollinate passion fruit flowers with a paintbrush.

There was thunder and lots of heavy rain tonight.

October 8
Life in the jungle: There was a lot of rain last night.  The smaller front pond is almost full, and a fair amount of water ended up in the larger pond.  But I am a little confused; I expected way more water in the new cistern.

This morning I worked on finishing my edits to What to pack on your first bike tour blog post that I started editing last week.  I then started the next round of proofreading my memoir.  The good thing is that I have a sense of this being my last proofread.

I then ran up to the village to drop off eggs.  I acquired some seedling trees that I’m not sure what they are.  On the way home, I came across a pair (male and female) Central American Wood turtles

I’m pretty tired.  There was lots of thunder tonight.

October 9
Life in the jungle: There was more rain throughout the night.  This morning I worked on a quick edit of 18 solid reasons to bike tour with a trailer.

After breakfast, I felt the need to work outside, just because I needed to be outside.  I did yard work by cleaning (chopping) around the greenhouse.  The humidity felt like 1,000%; every T-shirt swapped out was soaked in sweat within single-digit minutes of work.

I discovered a leak in the cistern.  One of the form-tie holes did not seal properly when we plugged the holes with hydraulic cement the other week.

October 10
Life in the jungle: I spent the morning rewriting my blog post Winter Bike Touring and Camping.  I put more effort into editing this post than my typical bike tour posts (now that I’m not bike touring) because I wrote it “before” I biked 4,900 km through a Canadian winter and needed to edit it accordingly.

After breakfast, I headed to the village to drop off eggs and pick up a sack of chicken food.  Coming home was very challenging with a 50 lbs sack of chicken food being pulled on a trailer with a flat tire.  Returning home, I finished yesterday’s yard work around the greenhouse.

Glossary of Terms
Glossary of words or people that may or may not be part of this particular blog post.  This glossary will be at the bottom of every Life in Belize blog post.

Wayne – He is the son of the original owners of the farm (both owners are deceased).  The original farm was two 30-acre parcels minus two – ¾ acre parcels for my house.  In 2017, Wayne sold me 40 acres of land from the original 60 acres (one 30-acre parcel plus 10 acres from the second parcel).  Wayne lives in his parents’ house and has a few cows on his remaining 18 acres of land.

Top-Gallon – The local term for when the Belize River floods its banks during the rainy season.

The ponds – I have two large (300ft long x 50ft wide x 10ft deep) ponds on my 30-acre parcel of land, which is basically a jungle.  I have about 60 coconut trees (mostly mature) around the ponds.  In my first two years of living in Belize, I also planted about 250 assorted fruit tree seedlings (Lime, jackfruit, custard apple, pomegranate, and avocado).

The coconut field – I have about 400 coconut trees planted (various growth states) on about 3 acres of cleared land of my 10-acre parcel.  I have planted about 350 assorted fruit trees (lemon, starfruit, mango, soursop, cashew, lime, orange), all raised from seed since my arrival in Belize in 2021.

The river lot – my house sits on a ¾ acre lot.  I have a second joining ¾ acre lot that allows me river frontage on the Belize River.  I call that my river lot.

The Dry – Belize has two main seasons.  The rainy season and the dry season (no rain).  The rainy season starts around June 1 and goes until the end of the year.  It seems June, November, and December are the wettest times of the year.

Chopping – using my machete to clear brush, vines, weeds, and unwanted trees.  Generally, when I chop, I am removing unwanted vegetation around my baby fruit trees.

I arrived at my home on November 25, 2021, by bicycle from Canada. I have journaled my daily adventures every day since.  Since I arrived, I have built a 1,000 sq-ft shade cloth greenhouse, a tiny apartment that I refer to as my greenhouse apartment.  I also started and am close to completing two small cabanas that I refer to as my smaller cabana and my larger cabana. The apartment and cabanas are for visitors and people wishing to move to my farm.  I’m also getting close to completing an additional 1,600 sq. ft. shade cloth greenhouse.

Pin It on Pinterest

Share This