Belize Part 117 (April 10 to 18)

Belize Part 117 (April 10 to 18)

April 10 Life in the jungle: The morning was filled with assorted small jobs.  Before breakfast, I headed to the village to pay for yesterday’s delivery of building materials and to pick up 100 ft of PVC pipe to be used as an electrical conduit.  I want to bring...
Belize Part 115 (March 15 to 29)

Belize Part 115 (March 15 to 29)

March 15 Life in the jungle: First thing I made patio stones and framed a form to make a ramp into Andy’s new dirt bike lean-to.  I had to go to the village to pick up four broiler chicks.  I (we) are going to start raising broiler chickens again.  I feel somehow, I...
Belize Part 114 (March 3 to 14)

Belize Part 114 (March 3 to 14)

March 3 Life in the jungle: Even though this is my day off I started my morning digging my septic trench.  I need my mornings to myself.  Jamie from across the river now comes over Saturdays and spends the night and now Andy has his friend visiting from Canada.  After...
Belize Part 113 (Feb 20 to March 2)

Belize Part 113 (Feb 20 to March 2)

February 20 Life in the jungle: The last few mornings have been kind of cold.  I spent a short time starting to dig my future septic trench.  I had an earlier breakfast than usual so I could start painting the greenhouse.  We need to enclose the greenhouse in shade...

Pin It on Pinterest