Belize Part 14 (Feb 4 to 11)

Belize Part 14 (Feb 4 to 11)

February 4 Life in the jungle: After doing laundry, first thing Heath and I biked 20 km’s to Rancho Delores to visit the farm Nery has worked at for the last 20 years.  They grow like 9 types of bamboo.  The bamboo is grown mostly for furniture but they...
Belize Part 13 (Jan 26 to Feb 3)

Belize Part 13 (Jan 26 to Feb 3)

January 26 Life in the jungle: With Nery coming this afternoon to look at my fencing project my priority was cleaning my last fence line on my home property that runs along the road.  I got a good section cleaned up but it is slow going with cleaning out the spiny...
The elephant in my room

The elephant in my room

A while back, I believe sometime in 2016 I realized that I was not a very happy person and that I was a very lonely person.  And for the first time I actually questioned that and asked myself if this was how I wanted to live the rest of my life.  I realized that my...
Belize Part 12 (Jan 21 to 25)

Belize Part 12 (Jan 21 to 25)

January 21 Life in the jungle: I started my morning continuing and hoping to finish digging my waterline trench.  I did get a pleasant surprise when I dug up a Mexican Burrowing Narrow-mouthed toad.  And I did not get far into my morning when it started to pour rain. ...
Belize Part 11 (Jan 15 to 20)

Belize Part 11 (Jan 15 to 20)

January 15 Life in the jungle: I was pretty productive most of the day.  I went into the bush and checked and found along my one property line for on old PVC pipe waterline and an electric wire that was used to run a water pump when we pumped water from one of the...
Belize Part 10 (Jan 9 to 14)

Belize Part 10 (Jan 9 to 14)

January 9 Life in the jungle: Because of how rough our road is getting, Derrick had to walk down our road.  Derrick came to install the plycem (plywood/cement mix wall boards) on my basement storage rooms.  I should mention Wayne (the other Belizean living on the...

Pin It on Pinterest