Belize Part 33 (July 3 to 9)

Belize Part 33 (July 3 to 9)

July 3 Life in the jungle: It’s Sunday so it wasn’t my most productive day.  With a late start to my day, I retrieved some more 1/2″ PVC pipe that had previously been laid and buried out towards the ponds past the coconut field.  I’ll need the...
Belize Part 32 (June 27 to July 2)

Belize Part 32 (June 27 to July 2)

Of note, last week I finally started building my greenhouse. June 27 Life in the jungle: I had a much better sleep last night.  Orlando and Joseph showed up this morning.  No concrete work today.  We put up most of the main 4×4 support posts and got a bunch of...
Belize Part 31 (June 21 to 26)

Belize Part 31 (June 21 to 26)

June 21 Life in the jungle: I slept okay last night but at 6 AM I woke up with a horrible cough.  So bad I got up and took a walk around the yard and went back to my hammock and fell asleep until 11 AM. After breakfast I worked most of the afternoon at the ponds.  ...
Belize Part 30 (June 13 to 20)

Belize Part 30 (June 13 to 20)

June 13 Life in the jungle: It rained all morning.  My allergies were at their worst and my cough was bad.  It took some Jack ass bitters that I had picked last week.  Last week Verna Mae showed me a jackass bitters plant.  I harvested some leaves to dry out.  The...

Pin It on Pinterest