Belize Part 41 (Aug 24 to Sept 1)

Belize Part 41 (Aug 24 to Sept 1)

August 24 Life in the jungle: I woke up at 5 AM, with the stress of a rotting and costly house deck falling back asleep was not possible.  [See photos in last blog post.]  I started my morning chopping the coconut field.  After breakfast I cut the grass at the ponds. ...
Belize Part 40 (Aug 20 to 23)

Belize Part 40 (Aug 20 to 23)

August 20 Life in the jungle: Orlando and Joseph came this morning.  We finished installing the door on the apartment and we put the roof on the front entrance of the greenhouse.  [The door was actually shipped damaged and I would return and replace it a month...
Belize Part 39 (Aug 9 to 19)

Belize Part 39 (Aug 9 to 19)

August 9 Life in the jungle: Orlando and Joseph showed up this morning.  We replaced the larger section of the house roof with the new zinc roofing that was delivered the other week.  We got lucky with no rain all day.  After they left, I cleaned everything up and...
Tired

Tired

I’m tired.  I can’t see my way forward [in this life] but I realize that there is nowhere else to go but forward.  And I am not afraid of moving forward.  But I feel like I am on a highway, and I missed my exit, but the next turn-off is literally 300,000 miles further...

Pin It on Pinterest